Integrated TEE Fitting End Cutting Flaring and Beveling Machine
Automated copper tee finishing: end cutting, flaring, and beveling in one 12-second cycle.
Industrial machine engineered for high-volume copper tee fitting manufacturers requiring precision port finishing. Integrates cutting, flaring, and beveling operations with servo-controlled automation to eliminate manual handling and secondary processing steps.
Key Specs
Key Specs
Power
Weight
Dimension
Speed
Overview Points
Universal Diameter Range
Integrated Processing
Servo Indexing
High Volume Output
Controlled Force
Proven Components
Automatic Feeding
Continuous Operation
Key Features
End cutting, flaring, and beveling are performed sequentially on a single platform with a servo-indexed rotating arm. Each hydro-formed copper tee exits the machine with all three ports trimmed, expanded, and beveled — ready for brazing or assembly with no downstream rework required.
A Mitsubishi servo motor drives the 4-station rotating arm through ±360° of travel at ±0.01 mm positioning accuracy. This ensures each tee fitting is aligned identically at every station, producing uniform port dimensions critical for leak-free HVAC and refrigeration joints.
With 12–15 second cycle times and automatic suction-cup feeding, the machine delivers 2,400–2,800 finished tee fittings per shift. Operators set parameters on the Mitsubishi HMI and monitor output — no manual part handling is needed between stations.
The 100 kN master cylinder and three independent 37 kN extrusion cylinders operate at up to 20 MPa, providing sufficient force to expand and bevel copper tube ends without cracking or wall thinning. The Taiwan-sourced hydraulic system paired with a 7.5 kW motor and 36 L/min oil pump maintains stable pressure across continuous production runs.
Every control and motion component is specified for durability: Mitsubishi PLC and servos, OMRON limit switches, IDEC/Siemens buttons and relays, NSK bearings, and AIRTAC pneumatics. This bill of materials reflects the same supplier standard used across NTBOBO’s installations for global brands including Midea, Daikin, and Bosch.
Technical Specifications
II Configuration
|
Part |
Brand |
|
|
1 |
Rotating arm |
Servo driving, for 4 stations |
|
2 |
Copper tee diameter |
15-28 mm |
|
3 |
Applicable blank tubes |
Hydro-formed Tee tube |
|
4 |
Cycle time |
12~15 seconds |
|
5 |
Productivity |
2400~2800 pcs/8 hours |
|
6 |
Master cylinder nominal force |
100kN |
|
7 |
Main cylinder liquid maximum working pressure |
20MPa |
|
8 |
Maximum travel of movable beam |
150mm |
|
9 |
Maximum distance between the movable beam and the working table |
300mm |
|
10 |
Extrusion cylinder nominal force |
3*37kN |
|
11 |
Maximum liquid working pressure of the extrusion cylinder |
20MPa |
|
12 |
Maximum stroke of extrusion cylinder piston |
80mm |
|
13 |
Distance between end of cylinder piston rod and center |
120mm |
|
14 |
Extrusion cylinder piston speed |
70~80mm/s |
|
15 |
Motor power |
7.5kW |
|
16 |
Oil pump flow |
36L/min |
|
17 |
Maximum rotating Angle |
±360 |
|
18 |
Accuracy |
±0.01 |
|
19 |
Suction cup pressure |
0.5MPa |
|
20 |
voltage |
380V±10%, three-phase five-wire system |
|
21 |
Working environment temperature |
-10 ºC~45 ºC |
|
22 |
Working environment humidity |
≤85% |
|
23 |
Dimension |
3200 x 2200 x 2150mm |
|
24 |
Weight |
About 5000KG |
III Main Technical data
|
Part |
Brand |
|
|
1 |
PLC + HMI |
Mitsubishi |
|
2 |
Pneumatic components |
AIRTAC |
|
3 |
Servo motor |
Mitsubishi |
|
4 |
Limit switch |
OMRON |
|
5 |
Buttons & relays |
IDEC / SIEMENS |
|
6 |
Main bearings |
NSK |
|
7 |
Hydraulic system |
Taiwan |
Applications
HVAC copper tee fitting production for air conditioning systems
Refrigeration tube component manufacturing
Plumbing copper fitting fabrication for residential and commercial pipework
Heat exchanger assembly preparation requiring beveled and flared tee joints
OEM copper tube fitting lines for appliance manufacturers
High-volume copper pipeline component finishing for industrial contractors
Video
FAQ
The key specifications of Integrated TEE Fitting End Cutting Flaring and Beveling Machine include: Power: 7.5kW, Weight: About 5000KG, Dimension: 3200 x 2200 x 2150mm, Speed: 70~80mm/s. Contact us for the full specification sheet.
Integrated TEE Fitting End Cutting Flaring and Beveling Machine is widely used in: HVAC copper tee fitting production for air conditioning systems; Refrigeration tube component manufacturing; Plumbing copper fitting fabrication for residential and commercial pipework; Heat exchanger assembly preparation requiring beveled and flared tee joints.
All NTBOBO machines come with a 1-year warranty from the date of Bill of Lading. Our engineering team provides 24-hour technical support throughout the warranty period.
We accept 30% down payment by T/T (Telegraphic Transfer), with the balance due before shipment. Other payment arrangements can be discussed for long-term partners.
Standard delivery is within 10-35 working days after receiving the down payment, depending on the machine model and customization requirements.
Our expertise is here to serve you
We take every question and need of yours seriously. Feel free to contact us!
80+ Global Countries & Regions
25+ Years of R&D & Welding Expertise
500+ Products with 100% Traceability
700+ Installations from Simulation to FAT

















