Steel Bundy Tube Straightening and Chipless Cutting Machine
Precision tube straightening and burr-free chipless cutting in one compact machine.
Industrial tube processing machine designed for refrigeration manufacturers requiring contamination-free cutting and precise straightening. Combines chipless cutting technology with multi-roller straightening to eliminate downstream quality issues in heat exchanger production.
Key Specs
Key Specs
Overview Points
Diameter Range
Chipless Cutting
Variable Speed
PLC Control
Length Accuracy
Multi-Roller Straightening
Compact Design
Power Options
Key Features
Unlike saw or rotary-blade cutting, the chipless pull-apart cutting mechanism leaves zero metal chips or internal burrs. This is critical for refrigeration tubing where even microscopic debris can block capillary tubes, damage expansion valves, or shorten compressor life. Tubes come off the machine ready for the next process step without secondary deburring.
The straightening section uses multiple sets of adjustable rollers arranged on different axes to progressively remove coil memory from steel and Bundy tubes. This delivers uniform straightness across the full 4–8 mm diameter range, ensuring tubes fit correctly into fin packs and heat exchanger assemblies without manual correction.
A TECO PLC paired with a TAIAN HMI touchscreen gives operators direct control over cut length, line speed, and batch count. Recipe storage allows quick changeover between tube specifications. The Omron encoder feeds real-time length data back to the PLC, maintaining ±0.5 mm/m accuracy regardless of speed setting.
Schneider contactors, TECO inverter drive, and CHNT pneumatic cylinders are selected for durability in factory environments running multiple shifts. The 1.12 kW motor keeps energy consumption low while delivering consistent feed force across the full 0–60 m/min speed range. The powder-coated steel frame resists corrosion and simplifies long-term maintenance.
At just 2300 × 650 mm in floor space, the machine slots between an uncoiler and a tube bending or assembly station without rearranging the production layout. Air supply requirement of 0.6–0.8 MPa aligns with standard factory compressed-air systems, avoiding the need for dedicated pneumatic infrastructure.
Technical Specifications
II.Configuration
|
No. |
Part |
Brand |
Remark |
|
1 |
Main Frame |
Home made |
Welding |
|
2 |
Painting |
Home made |
Powder Coating / customized color |
|
3 |
Inverter |
TECO |
Speed Adjustment |
|
4 |
PLC |
TECO |
CE/FC |
|
5 |
HMI |
TAIAN |
CE |
|
6 |
Encoder |
Omron |
CE |
|
7 |
Contactor |
Schneider |
CE |
|
8 |
Cylinder |
CHNT |
CE |
|
9 |
Motor |
Local brand |
CE/CCC |
III.Main Technical Data
|
No. |
Parameter |
Data |
|
1 |
Tube Material |
Steel tube/ Bundy tube |
|
2 |
Tube Diameter |
4-8mm |
|
3 |
Cutting Length |
>50mm |
|
4 |
Work Speed |
0~60m/min, adjustable by Inverter |
|
5 |
Cutting Tolerance |
0.5mm/1m |
|
6 |
Control System |
PLC control / HMI |
|
7 |
Air Pressure |
0.6-0.8MPa |
|
8 |
Motor Power |
1.12KW |
|
9 |
Electric System |
380V, 50Hz, 3Phae (Customized) |
|
10 |
Dimension |
2300 x 650 x 1300 mm |
|
11 |
Weight |
460 KG |
Applications
Refrigeration evaporator and condenser tube processing
HVAC heat exchanger component manufacturing
Automotive fuel line and brake line tube preparation
Small-diameter copper-steel Bundy tube production for appliance manufacturers
Capillary tube and fluid transfer line fabrication
Water heater and boiler heat exchange tube processing
Video
FAQ
Steel Bundy Tube Straightening and Chipless Cutting Machine is widely used in: Refrigeration evaporator and condenser tube processing; HVAC heat exchanger component manufacturing; Automotive fuel line and brake line tube preparation; Small-diameter copper-steel Bundy tube production for appliance manufacturers.
All NTBOBO machines come with a 1-year warranty from the date of Bill of Lading. Our engineering team provides 24-hour technical support throughout the warranty period.
We accept 30% down payment by T/T (Telegraphic Transfer), with the balance due before shipment. Other payment arrangements can be discussed for long-term partners.
Standard delivery is within 10-35 working days after receiving the down payment, depending on the machine model and customization requirements.
Our expertise is here to serve you
We take every question and need of yours seriously. Feel free to contact us!
80+ Global Countries & Regions
25+ Years of R&D & Welding Expertise
500+ Products with 100% Traceability
700+ Installations from Simulation to FAT























