Duct Manufacture Auto-line II
Delivery terms: EXW,FCA,FAS,FOB,CFR,CIF,CPT,CIP,DAT,DAP,DDP
Payment: 30% down payment by T/T,the balance down before shipment.
Lead time: witin 10-35 days after receiving down payment.
Guarantee: within one year since date of B/L.
- Specification
Line II consists of a feeding metal frame unit, leveler grooving roller, notch and punch square machine, shearing machine. The electrical control system uses a computer combined with a closed-loop servo-system to increase the precision and stabilization of the line.
FLOW CHART
BASIC EQUIPMENT
A: Two power metal feeding frames
B: One leveler grooving roller machine
C: Four hydraulic notch and die
D: Hydraulic shearing machine
E: Industrial computer and specific software