All Categories
EN

All

Duct Manufacture Auto-line II

Duct Manufacture Auto-line II

Delivery terms: EXW, FCA, FAS, FOB, CFR, CIF, CPT, CIP, DAT, DAP, DDP

Payment: 30% down payment by T/T,the balance down before shipment.

Lead time: witin 10-35 days after receiving down payment.

Guarantee: within one year since date of B/L.


  • Overview
  • Parameter
  • Inquiry
  • Related Products
Two power metal feeding frames
One leveler grooving roller machine
Four hydraulic notch and die
Hydraulic shearing machine
Industrial computer and specific software

Line II consists of a feeding metal frame unit, leveler grooving roller, notch and punch square machine, shearing machine. The electrical control system uses a computer combined with a closed-loop servo-system to increase the precision and stabilization of the line. 

GET IN TOUCH

Hot categories